I am working on a replacement for this MC.
It's already on the PT, but needs a rewrite. See this thread too.
The main structure is finished and I'm now working on the hidden connector between body and fork.
I hope to be finished within a month.
Edit: This part is now done and uploaded at PT as 4480c01.dat
It's already on the PT, but needs a rewrite. See this thread too.
The main structure is finished and I'm now working on the hidden connector between body and fork.
I hope to be finished within a month.
Edit: This part is now done and uploaded at PT as 4480c01.dat