Problems with 4218a and 4219a
2013-02-21, 19:54 (This post was last modified: 2013-04-05, 7:18 by Max Martin Richter.)
2013-02-21, 19:54 (This post was last modified: 2013-04-05, 7:18 by Max Martin Richter.)
Hej guys,
while building the roof of 10224-1 Town Hall, I run into a problem with both mentioned parts. It seems, that they are not long enough (between the connectors).
In LDD it seems to be exaktly 20 LDU, for the Townhall I need 20.17 LDU. But our parts are only 19 LDU between the connectors. This seems wrong to me. Also the name seems to be wrong, because there is no b-part.
Unfortunately I don't own this to correct it. And I don't really trust LDD in such things.
So if you own these parts please have a look onto it. Thanks.
/Max
while building the roof of 10224-1 Town Hall, I run into a problem with both mentioned parts. It seems, that they are not long enough (between the connectors).
In LDD it seems to be exaktly 20 LDU, for the Townhall I need 20.17 LDU. But our parts are only 19 LDU between the connectors. This seems wrong to me. Also the name seems to be wrong, because there is no b-part.
Unfortunately I don't own this to correct it. And I don't really trust LDD in such things.
So if you own these parts please have a look onto it. Thanks.
/Max