(2021-06-10, 19:49)Roland Melkert Wrote: Why don't you just add a symlink?
It would only need a small post operation on top of the normal release procedure, namely:
copy the new complete.zip to something like 20210610-complete.zip and then symlink complete.zip to it.
On the next release you do the same but the old zip will remain.
The packages need to pull the 20210610-complete.zip variant during building, not sure how they (automatically) would know which one is currently the newest though. Mayby a small info file like "https://www.ldraw.org/library/releaseInfo.txt"
my 2cts
Maybe when we start planning the software to replace the Parts Tracker but not until then.