(2019-04-07, 20:12)David Manley Wrote: Does the attached model achieve what you are aiming for?
It shows;
David
- two bricks as a sub-model done as a callout then
- placed on a single brick. Followed by
- the same sub-model (but ignored) and then
- using the LPUB PLI BEGIN SUB command twwice to insert the two parts from the ignored sub-model
- with a single brick, to list the three bricks in the part list
- the bill of materials at the end is correct.
Hi David,
very interesting, I would never have thought of such an approach. Yes, I think it does achieve what I am aiming for. I am not sure whether I want to apply it large scale, but it's certainly an eye-opener.
Thank you,
Lutz